Completed MJOLNIR: The minimalistic – but not boring – 9.7L Case

Which MJOLNIR I are you interested in?

  • Standard Version - 299 USD

    Votes: 484 74.3%
  • RGB Version (No controller) - 319 USD

    Votes: 63 9.7%
  • RGB Version (With controller) - 349 USD

    Votes: 104 16.0%

  • Total voters
    651

kuj0

Trash Compacter
Jul 11, 2023
47
33
Ordered a 90 degree c13 to c14 adapter (aka the Welleen WA-0092) for the NanoQ today. From the instruction manual, it appears that this is the correct angle if you want to use your case vertically (with the handles) and want your cables to run out the back of the PC while it is in that orientation. This will allow the power button to be located closest to the front of the PC while it is in vertical orientation.

Also snagged a 90 degree "left angled" c13 cable in case I want to set it up the way Devyn Johnston has his vertical build set up in his video (wide side to the front). Will update with any findings once I've received my case.

Still nervous about how unstable the handles/bumpers seem to be in the vertical orientation. I would feel much more comfortable standing up thousands of dollars of PC hardware if the feet were rock solid, but what I've seen in videos doesn't fully inspire that confidence for me.
 
  • Like
Reactions: AlexTzone

oiz

Cable Smoosher
Feb 10, 2023
8
4
You probably need a fan slipper :) You don’t need to connect the power button from the Booster Cell if you don’t want, so you can absolutely you the power button on your BORG. Let me know if I understood your question correctly :)

I know, i don't have to make all the power buttons work. I just wanna try to use both of them. Sounds cool for me.

Another question, do you have the list of psu cable length for the not flipped psu? I can only find the list for the flipped one (type 1).
 
Last edited:
  • Like
Reactions: AlexTzone

AlexTzone

I design minimalistic – but not boring – PC stuff
Original poster
THOR ZONE
Silver Supporter
Sep 23, 2017
1,303
2,758
thor-zone.com
I know, i don't have to make all the power buttons work. I just wanna try to use both of them. Sounds cool for me.

Another question, do you have the list of psu cable length for the not flipped psu? I can only find the list for the flipped one (type 1).

You can absolutely chain them together with some with some simple diy :)

Good luck with the launch. Hope the manufacturing doesn't delay shipping.

Nice to hear from you again, thank you and I hope so too :)

At Thorzone any updates ? Still shipping in late May or are we now looking at June or even July ?

Graphite has begun assembly and packaging since it has been completed at the anodizing plant. Up next are carbon and moonstone. We will have shipped most if not all Graphite units before the end of May, with Carbon and Moonstone finishing shipping around early June.

I forgot to show you guys this earlier, but the nickel plated stainless steel and aluminium parts turned out nice 😄

IMG_2557.jpeg
 

LanceL

Chassis Packer
Jun 9, 2017
13
4
You can absolutely chain them together with some with some simple diy :)



Nice to hear from you again, thank you and I hope so too :)



Graphite has begun assembly and packaging since it has been completed at the anodizing plant. Up next are carbon and moonstone. We will have shipped most if not all Graphite units before the end of May, with Carbon and Moonstone finishing shipping around early June.

I forgot to show you guys this earlier, but the nickel plated stainless steel and aluminium parts turned out nice 😄

View attachment 3343

Why did I order carbon LOL :-) so basically for us that ordered Carbon color we will recieve it at our adress in Europe end of June earliest ?
 

AlexTzone

I design minimalistic – but not boring – PC stuff
Original poster
THOR ZONE
Silver Supporter
Sep 23, 2017
1,303
2,758
thor-zone.com
Why did I order carbon LOL :-) so basically for us that ordered Carbon color we will recieve it at our adress in Europe end of June earliest ?

Because it’s a sweet color ofc 😁 We ship by express so it shouldn’t take more than 3-5 days (about 3 for EU) once we send them out, so they shouldn’t arrive that late.
 

AlexTzone

I design minimalistic – but not boring – PC stuff
Original poster
THOR ZONE
Silver Supporter
Sep 23, 2017
1,303
2,758
thor-zone.com
We literally have 3 more days before the end of May. What’s the updated timeline for case delivery?

Will post an update tomorrow, basically assembly is a bit slower because this is our first time with NANOQ and we want to avoid damaging anything, some accessories and AIO boxes are tricky to fold which also adds a bit to assembly time, and we had to re-make the thumb screw that holds the bottom of the GPU bracket (got them back this Monday). Nothing major really, this whole journey has been smooth pretty much all the way, but it will push shipping into June. Graphite will still be first and will go out around early June. All in all, with only one step remaining, I’m confident we’ll see no more delays.

Graphite is basically almost finished, the assembly team expects them to be ready in 3-5 days.
 
Last edited:

LanceL

Chassis Packer
Jun 9, 2017
13
4
Will post an update tomorrow, basically assembly is a bit slower because this is our first time with NANOQ and we want to avoid damaging anything, some accessories and AIO boxes are tricky to fold which also adds a bit to assembly time, and we had to re-make the thumb screw that holds the bottom of the GPU bracket (got them back this Monday). Nothing major really, this whole journey has been smooth pretty much all the way, but it will push shipping into June. Graphite will still be first and will go out around early June. All in all, with only one step remaining, I’m confident we’ll see no more delays.

Graphite is basically almost finished, the assembly team expects them to be ready in 3-5 days.

At which date in June would Carbon color be shipped with the new time plan (including the slight new delay You mentioned) ?
 

LanceL

Chassis Packer
Jun 9, 2017
13
4
Will post an update tomorrow, basically assembly is a bit slower because this is our first time with NANOQ and we want to avoid damaging anything, some accessories and AIO boxes are tricky to fold which also adds a bit to assembly time, and we had to re-make the thumb screw that holds the bottom of the GPU bracket (got them back this Monday). Nothing major really, this whole journey has been smooth pretty much all the way, but it will push shipping into June. Graphite will still be first and will go out around early June. All in all, with only one step remaining, I’m confident we’ll see no more delays.

Graphite is basically almost finished, the assembly team expects them to be ready in 3-5 days.

Alex i did not include Lightrays when i made my order, can we still add it to my current order without it causing any delays ? and if so how can I easy pay for it and get it added to my existing order ?